Aardingskit voor HS luchtlijnen 9KA/1s
Earthing and short-circuiting equipment for high-voltage overhead lines.
Its main purpose is to protect workers against accidental switching on or voltage recurrence during repair work.
The MPLE clamp is fastened to the exposed conductor by means of a clamping screw. This equipment features an MPLP (carrier) clamp that makes it easy to hoist and install all three clamps at the same time, considerably reducing installation time.
Complies with IEC 61230 standard.
Consists of:
2 MPLE aluminum alloy clamps with clamping screws for cylindrical conductors with diameters from 5 to 45 mm.
1 aluminum alloy MPLP clamp (carrier) with clamping screws for cylindrical conductors with diameters from 5 to 45 mm.
2 copper cables with PVC insulation, 95 mm2 cross-section and 2.5 m long.
1 copper cable with 95 mm2 PVC insulation, 5 m long.
2 TT-38L grounding clamps.
1 PEP-ECO clamp for substation.
1 copper cable with PVC insulation, 95 mm2 cross-section, 13 m long.
1 grounding rod.
1 telescopic pole (1.10 m folded and 2 m unfolded).
1 bag for transporting and storing equipment.
1 bag for transporting pole and stake.
Its main purpose is to protect workers against accidental switching on or voltage recurrence during repair work.
The MPLE clamp is fastened to the exposed conductor by means of a clamping screw. This equipment features an MPLP (carrier) clamp that makes it easy to hoist and install all three clamps at the same time, considerably reducing installation time.
Complies with IEC 61230 standard.
Consists of:
2 MPLE aluminum alloy clamps with clamping screws for cylindrical conductors with diameters from 5 to 45 mm.
1 aluminum alloy MPLP clamp (carrier) with clamping screws for cylindrical conductors with diameters from 5 to 45 mm.
2 copper cables with PVC insulation, 95 mm2 cross-section and 2.5 m long.
1 copper cable with 95 mm2 PVC insulation, 5 m long.
2 TT-38L grounding clamps.
1 PEP-ECO clamp for substation.
1 copper cable with PVC insulation, 95 mm2 cross-section, 13 m long.
1 grounding rod.
1 telescopic pole (1.10 m folded and 2 m unfolded).
1 bag for transporting and storing equipment.
1 bag for transporting pole and stake.